Skip to main content

Pump Testing

District staff and project partners recently tested the control systems for RD 900's newest pump station to verify proper operation and ensure the equipment is functioning as designed. These tests are an important step in maintaining a reliable drainage system and preparing the station for continued service.

Two individuals are observing equipment in a workshop, with machinery and an American flag visible in the background.
Two individuals are inspecting machinery or electrical equipment, discussing or troubleshooting wiring inside a control panel.